Installed hardwood flooring in a Toronto home
Services · Flooring

Flooring.

Hardwood, laminate, vinyl and tile — installation, refinishing, and the subfloor work most contractors skip.

Why Flooring

The surface you stand on every day.

Flooring is the most-touched material in any home — and the most ruthless about poor installation. Squeaks, gaps, lifted edges, uneven seams. We pull old floors, fix the subfloor, and install hardwood, laminate, vinyl, or tile with proper expansion gaps, underlayment, and patterns that hide nothing.

Most flooring problems start below the surface. We start there too.

Flooring Services

Every surface, properly laid.

Hardwood Installation

Solid and engineered hardwood — nailed, glued, or floated to spec.

What's included
  • Solid hardwood (oak, maple, walnut)
  • Engineered hardwood
  • Plank widths 2.25" to 7"
  • Nail-down or glue-down install
  • Floating click-lock systems
  • Expansion gaps and transition strips
Hardwood flooring planks being installed
FAQ

Got questions? We've got answers.

The most common things homeowners ask before booking. Don't see yours? Call us or send a message.

  • A medium-sized room (200 sq ft) takes 1–2 days for laminate or vinyl, 2–3 days for hardwood, and 3–5 days for tile (including grout cure). Full-house projects run 1–2 weeks.

Let's Talk

Ready to get started?

Free on-site estimate. Zero pressure. We'll measure, color-match, and write a clean quote — all at your home, often in under an hour.

Map showing SQFT Contracting service area across the Greater Toronto Area
Now Serving · GTA